
A Glimpse into WBSI, Inc. Past, Present
and Future Building Automation Projects
Denver International Airport ~ Denver, Colorado
A state of the art international airport, one of the newest in the nation.

WBSI replaced the environmental controls in all of the Jetways
in Concourse B. Then, concurrently via a LonWorks integration,
concourses A and C Jetways were also connected to the
facility's secure ethernet. The entire project was performed
without interruption to airport/airline operations. |
|
|
|
National Jewish Medical Center
~ Denver, Colorado
Globally recognized as one of our
nation's pre-eminent respiratory
hospital and research center.
WBSI currently has a networked
DDC system in 13 buildings on
campus with over 1,172 control
points. |
 |
Adams 12 Five Star School District
~ Denver, Colorado

Controls system installation and monitoring consisting of 60
schools with 22 web based Tridium integration projects.
WBSI continues to upgrade older controls installations for the
existing schools along with the modernization of controls in the
newer facilities. We are proud to share in the growth of one of
the state's largest school districts. |
|
|
|
 |
City of Thornton ~ Thornton, Colorado
Controls system installation and
monitoring of heating and cooling
systems, AHU’s CAV, VAV,CO2,
and RTU’s. The City of Thornton
represents a growing metropolitan
region along the front range. |
The control systems WBSI installed and monitors runs a
spectrum of applications from administrative and municipal to
police station and courthouse/detention facilities. |
|
|
|
|
Bonfils Blood Center
Headquarters and Lab
WBSI was selected as the primary building integration contractor to install both the HVAC and Door access security controls. With the conitinual growth Bonfils has experienced over the past 12 years, WBS has expanded and upgraded the systems to the current state of the art without having to replace them.
|
|
 |